{"id":44,"date":"2026-06-27T02:29:16","date_gmt":"2026-06-27T02:29:16","guid":{"rendered":"https:\/\/www.fsa-law.com\/?p=44"},"modified":"2026-06-27T03:50:03","modified_gmt":"2026-06-27T03:50:03","slug":"our-history","status":"publish","type":"post","link":"https:\/\/www.fsa-law.com\/?p=44","title":{"rendered":"Power Utilities"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"44\" class=\"elementor elementor-44\">\n\t\t\t\t<div class=\"elementor-element elementor-element-58c5f657 e-flex e-con-boxed e-con e-parent\" data-id=\"58c5f657\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-406dae77 elementor-widget elementor-widget-text-editor\" data-id=\"406dae77\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<ol><li><span class=\"NormalTextRun SCXW7962948 BCX4\">Advised<\/span><span class=\"NormalTextRun SCXW7962948 BCX4\"> a consortium of major energy companies on potential bid for capitalizing a <\/span><span class=\"NormalTextRun SCXW7962948 BCX4\">special purpose vehicle<\/span> <span class=\"NormalTextRun SCXW7962948 BCX4\">through which a state-owned power generating <\/span><span class=\"NormalTextRun SCXW7962948 BCX4\">company was to be<\/span> <span class=\"NormalTextRun SCXW7962948 BCX4\">restructured. We advised on: (<\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW7962948 BCX4\">i<\/span><span class=\"NormalTextRun SCXW7962948 BCX4\">) labor cost of transferring that company\u2019s personnel to <\/span><span class=\"NormalTextRun SCXW7962948 BCX4\">the <\/span><span class=\"NormalTextRun SCXW7962948 BCX4\">projected SPV; (ii) a voluntary retirement package; and (iii) taxation risks conveyed by the overall transaction. <\/span><span class=\"NormalTextRun SCXW7962948 BCX4\">The <\/span><span class=\"NormalTextRun SCXW7962948 BCX4\">consortium did not bid<\/span><span class=\"NormalTextRun SCXW7962948 BCX4\">.<\/span><\/li><li aria-setsize=\"-1\" data-leveltext=\"%1.\" data-font=\"Times New Roman\" data-listid=\"9\" data-list-defn-props=\"{&quot;335552541&quot;:0,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Times New Roman&quot;,&quot;469769242&quot;:[65533,0],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;%1.&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"12\" data-aria-level=\"1\"><span data-contrast=\"none\">Performed a comprehensive due diligence of eight state-owned power distributors on the Colombian Caribbean coast and of their holding company to assess risk in bidding to capitalize two SPVs to which those distributors\u2019 assets and obligations were transferred as part of a regional restructuring program. We examined the bidding terms and counseled negotiations with possible co-bidders. The client opted not to bid based on our risk assessments (power losses, labor liabilities, and tariff insufficiency).<\/span><span data-ccp-props=\"{&quot;134245417&quot;:false,&quot;335551550&quot;:6,&quot;335551620&quot;:6}\"> <span class=\"NormalTextRun SCXW31101579 BCX4\">Such <\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">risks<\/span> <span class=\"NormalTextRun SCXW31101579 BCX4\">remained <\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">and were <\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">the basis for two <\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">further <\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">bids <\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">opened by the majority shareholders <\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">for the <\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">majority interest<\/span> <span class=\"NormalTextRun SCXW31101579 BCX4\">in <\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">those <\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">same SPVs<\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">. W<\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">e again did <\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">the due diligence and TOR study<\/span> <span class=\"NormalTextRun SCXW31101579 BCX4\">for <\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">the first bid<\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">, <\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">having reiterated the <\/span><span class=\"NormalTextRun SCXW31101579 BCX4\">initial<\/span><span class=\"NormalTextRun SCXW31101579 BCX4\"> risk analysis. Our client did not tender.<\/span><span class=\"TextRun SCXW172467616 BCX4\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW172467616 BCX4\">The original structure we <\/span><span class=\"NormalTextRun SCXW172467616 BCX4\">advised<\/span> <span class=\"NormalTextRun SCXW172467616 BCX4\">against <\/span><span class=\"NormalTextRun SCXW172467616 BCX4\">was <\/span><span class=\"NormalTextRun SCXW172467616 BCX4\">finally <\/span><span class=\"NormalTextRun SCXW172467616 BCX4\">replaced in 202<\/span><span class=\"NormalTextRun SCXW172467616 BCX4\">0<\/span><span class=\"NormalTextRun SCXW172467616 BCX4\"> by the granting of power distribution <\/span><span class=\"NormalTextRun SCXW172467616 BCX4\">on the <\/span><span class=\"NormalTextRun SCXW172467616 BCX4\">Colomb<\/span><span class=\"NormalTextRun SCXW172467616 BCX4\">i<\/span><span class=\"NormalTextRun SCXW172467616 BCX4\">an C<\/span><span class=\"NormalTextRun SCXW172467616 BCX4\">a<\/span><span class=\"NormalTextRun SCXW172467616 BCX4\">ribbean <\/span><span class=\"NormalTextRun SCXW172467616 BCX4\">region to two new state-leveraged utilities<\/span><span class=\"NormalTextRun SCXW172467616 BCX4\"> which are yet enduring similar problems<\/span><span class=\"NormalTextRun SCXW172467616 BCX4\">.<\/span><\/span><span class=\"EOP Selected SCXW172467616 BCX4\" data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559685&quot;:720}\">\u00a0<\/span><\/span><\/li><li><span class=\"TextRun SCXW110712623 BCX4\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW110712623 BCX4\">Advised<\/span><\/span><span class=\"TextRun SCXW110712623 BCX4\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"auto\"> <span class=\"NormalTextRun SCXW110712623 BCX4\">and <\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">represent<\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">ed<\/span><span class=\"NormalTextRun SCXW110712623 BCX4\"> a <\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">tempora<\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">ry union of ma<\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">jor <\/span><\/span><span class=\"TextRun SCXW110712623 BCX4\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW110712623 BCX4\">energy companies <\/span><\/span><span class=\"TextRun SCXW110712623 BCX4\" lang=\"EN-US\" xml:lang=\"EN-US\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW110712623 BCX4\">for <\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">successfully <\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">bidding for <\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">purchase <\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">of a 500 MW hydroelectric generation facility <\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">through a <\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">privati<\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">z<\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">a<\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">tion<\/span><span class=\"NormalTextRun SCXW110712623 BCX4\"> process <\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">b<\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">y<\/span><span class=\"NormalTextRun SCXW110712623 BCX4\"> the Colombian government<\/span><span class=\"NormalTextRun SCXW110712623 BCX4\">.<\/span><\/span><\/li><li aria-setsize=\"-1\" data-leveltext=\"%1.\" data-font=\"Times New Roman\" data-listid=\"9\" data-list-defn-props=\"{&quot;335552541&quot;:0,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Times New Roman&quot;,&quot;469769242&quot;:[65533,0],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;%1.&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"14\" data-aria-level=\"1\"><span data-contrast=\"none\">Advised<\/span><span data-contrast=\"auto\"> and represented a temporary union of major <\/span><span data-contrast=\"none\">energy companies to bi<\/span><span data-contrast=\"auto\">d unsuccessfully for purchasing a 1,000 MW hydroelectric generation facility through a privatization process by the Colombian government. <\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;469777462&quot;:[0,708,1416,2124,2832,3540,4248],&quot;469777927&quot;:[0,0,0,0,0,0,0],&quot;469777928&quot;:[1,1,1,1,1,1,1]}\">\u00a0<\/span><\/li><li><span class=\"NormalTextRun SCXW167032499 BCX4\">Analysis of <\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">ter<\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">m<\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">s of reference <\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">and due diligence for potential <\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">bid <\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">by <\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">client <\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">for capitalization of a new state-owned <\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">Caribbean <\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">C<\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">oast <\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">energy generation and trading company<\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">. The due diligence includ<\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">ed <\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">assessing legal risk<\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">s<\/span><span class=\"NormalTextRun SCXW167032499 BCX4\"> of main power sales contracts<\/span> <span class=\"NormalTextRun SCXW167032499 BCX4\">involving 1500 MW<\/span><span class=\"NormalTextRun SCXW167032499 BCX4\"> generating capacity<\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">. The client chose not to <\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">bid so that <\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">the <\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">projected company was not incorporated<\/span><span class=\"NormalTextRun SCXW167032499 BCX4\">.<\/span><\/li><li><span class=\"NormalTextRun SCXW52342160 BCX4\">Advi<\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">sed <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">and represent<\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">ed <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">our client\u2019s <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">consortium <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">for<\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">: (<\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW52342160 BCX4\">i<\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">) submi<\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">tting <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">a successful bid to <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">a regional <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">power distributor <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">for financing, construction<\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">,<\/span><span class=\"NormalTextRun SCXW52342160 BCX4\"> operation <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">and <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">ownership <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">of a 230MW <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">combined cycle gas\/vapor <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">power generation plant; (ii) negotiat<\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">ed <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">and execut<\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">ed <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">a <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">po<\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">wer purchase <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">agreement <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">(PPA) <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">with <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">the <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">condition precedent <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">that <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">a <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">gas supply contract acceptable to the consortium<\/span><span class=\"NormalTextRun SCXW52342160 BCX4\"> be attained, that having failed notwithstanding the consortium\u2019s best efforts<\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">; <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">and, (iii) negotiation of <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">an <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">amicable <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">PPA <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">termination <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">agreement <\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">with waiver of the performance guarantee<\/span><span class=\"NormalTextRun SCXW52342160 BCX4\">.<\/span><\/li><li><span class=\"NormalTextRun SCXW263042441 BCX4\">Advi<\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">sed <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">and <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">represent<\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">ed<\/span><span class=\"NormalTextRun SCXW263042441 BCX4\"> a <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">leading <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">energy infrastructure <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">civil works <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">contractor <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">for<\/span> <span class=\"NormalTextRun SCXW263042441 BCX4\">the <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">submission <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">of <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">a <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">successful bid <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">through <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">a <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">temporary <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">union with<\/span><span class=\"NormalTextRun SCXW263042441 BCX4\"> a <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">world leading power generator <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">for <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">a <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">turnkey contract <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">with <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">a <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">municipal <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">utility <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">for <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">three <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">combined cycle <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">450 MW <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">generation plant<\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">s<\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">.<\/span><span class=\"NormalTextRun SCXW263042441 BCX4\"> The project was <\/span><span class=\"NormalTextRun SCXW263042441 BCX4\">executed.<\/span><\/li><li aria-setsize=\"-1\" data-leveltext=\"%1.\" data-font=\"Times New Roman\" data-listid=\"9\" data-list-defn-props=\"{&quot;335552541&quot;:0,&quot;335559685&quot;:720,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Times New Roman&quot;,&quot;469769242&quot;:[65533,0],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;%1.&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"18\" data-aria-level=\"1\"><span data-contrast=\"auto\"><span data-ccp-parastyle=\"No Spacing\">Advised the minority shareholder in a company that owns a 230MW thermal power plant on whether to accept an offer made by the majority shareholder to sell its shares to the remaining shareholders (our client and a municipal residential utility company) or to tag on to the sale offer. The decision <\/span><span data-ccp-parastyle=\"No Spacing\">on our advice <\/span><span data-ccp-parastyle=\"No Spacing\">was to buy <\/span><span data-ccp-parastyle=\"No Spacing\">considering <\/span><span data-ccp-parastyle=\"No Spacing\">advantageous<\/span> <span data-ccp-parastyle=\"No Spacing\">regulation on the <\/span><span data-ccp-parastyle=\"No Spacing\">thermal plant permanent availability charge in the Colombian energy market. We negotiated the <\/span><span data-ccp-parastyle=\"No Spacing\">assignment\u2019s<\/span><span data-ccp-parastyle=\"No Spacing\"> conditions until the deal successfully closed between all parties.<\/span><\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/li><\/ol>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Advised a consortium of major energy companies on potential bid for capitalizing a special purpose vehicle through which a state-owned power generating company was to be restructured. We advised on: (i) labor cost of transferring that company\u2019s personnel to the projected SPV; (ii) a voluntary retirement package; and (iii) taxation risks conveyed by the overall [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":87,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[17],"tags":[],"class_list":["post-44","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-category1"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\r\n<title>Power Utilities - Figueroa Sierra &amp; Asociados<\/title>\r\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\r\n<link rel=\"canonical\" href=\"https:\/\/www.fsa-law.com\/?p=44\" \/>\r\n<meta property=\"og:locale\" content=\"es_ES\" \/>\r\n<meta property=\"og:type\" content=\"article\" \/>\r\n<meta property=\"og:title\" content=\"Power Utilities - Figueroa Sierra &amp; Asociados\" \/>\r\n<meta property=\"og:description\" content=\"Advised a consortium of major energy companies on potential bid for capitalizing a special purpose vehicle through which a state-owned power generating company was to be restructured. We advised on: (i) labor cost of transferring that company\u2019s personnel to the projected SPV; (ii) a voluntary retirement package; and (iii) taxation risks conveyed by the overall [&hellip;]\" \/>\r\n<meta property=\"og:url\" content=\"https:\/\/www.fsa-law.com\/?p=44\" \/>\r\n<meta property=\"og:site_name\" content=\"Figueroa Sierra &amp; Asociados\" \/>\r\n<meta property=\"article:published_time\" content=\"2026-06-27T02:29:16+00:00\" \/>\r\n<meta property=\"article:modified_time\" content=\"2026-06-27T03:50:03+00:00\" \/>\r\n<meta property=\"og:image\" content=\"https:\/\/www.fsa-law.com\/wp-content\/uploads\/2026\/06\/energia.png\" \/>\r\n\t<meta property=\"og:image:width\" content=\"75\" \/>\r\n\t<meta property=\"og:image:height\" content=\"75\" \/>\r\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\r\n<meta name=\"author\" content=\"admin\" \/>\r\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\r\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutos\" \/>\r\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/?p=44#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/?p=44\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/#\\\/schema\\\/person\\\/cf17cf84cb7994774463eef9b6d69e70\"},\"headline\":\"Power Utilities\",\"datePublished\":\"2026-06-27T02:29:16+00:00\",\"dateModified\":\"2026-06-27T03:50:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/?p=44\"},\"wordCount\":545,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/?p=44#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fsa-law.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/energia.png\",\"articleSection\":[\"category1\"],\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.fsa-law.com\\\/?p=44#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/?p=44\",\"url\":\"https:\\\/\\\/www.fsa-law.com\\\/?p=44\",\"name\":\"Power Utilities - Figueroa Sierra &amp; Asociados\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/?p=44#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/?p=44#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.fsa-law.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/energia.png\",\"datePublished\":\"2026-06-27T02:29:16+00:00\",\"dateModified\":\"2026-06-27T03:50:03+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/?p=44#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.fsa-law.com\\\/?p=44\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/?p=44#primaryimage\",\"url\":\"https:\\\/\\\/www.fsa-law.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/energia.png\",\"contentUrl\":\"https:\\\/\\\/www.fsa-law.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/energia.png\",\"width\":75,\"height\":75},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/?p=44#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.fsa-law.com\\\/?page_id=21\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Power Utilities\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/#website\",\"url\":\"https:\\\/\\\/www.fsa-law.com\\\/\",\"name\":\"Figueroa Sierra &amp; Asociados\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.fsa-law.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/#organization\",\"name\":\"Figueroa Sierra &amp; Asociados\",\"url\":\"https:\\\/\\\/www.fsa-law.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.fsa-law.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-logo-fsa-law-es-blanco.png\",\"contentUrl\":\"https:\\\/\\\/www.fsa-law.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-logo-fsa-law-es-blanco.png\",\"width\":360,\"height\":60,\"caption\":\"Figueroa Sierra &amp; Asociados\"},\"image\":{\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.fsa-law.com\\\/#\\\/schema\\\/person\\\/cf17cf84cb7994774463eef9b6d69e70\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ec091cb053cefce3948a2248410c46135031d7aa746808e318d240a9dc42ad40?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ec091cb053cefce3948a2248410c46135031d7aa746808e318d240a9dc42ad40?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ec091cb053cefce3948a2248410c46135031d7aa746808e318d240a9dc42ad40?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\\\/\\\/www.fsa-law.com\"],\"url\":\"https:\\\/\\\/www.fsa-law.com\\\/?author=1\"}]}<\/script>\r\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Power Utilities - Figueroa Sierra &amp; Asociados","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.fsa-law.com\/?p=44","og_locale":"es_ES","og_type":"article","og_title":"Power Utilities - Figueroa Sierra &amp; Asociados","og_description":"Advised a consortium of major energy companies on potential bid for capitalizing a special purpose vehicle through which a state-owned power generating company was to be restructured. We advised on: (i) labor cost of transferring that company\u2019s personnel to the projected SPV; (ii) a voluntary retirement package; and (iii) taxation risks conveyed by the overall [&hellip;]","og_url":"https:\/\/www.fsa-law.com\/?p=44","og_site_name":"Figueroa Sierra &amp; Asociados","article_published_time":"2026-06-27T02:29:16+00:00","article_modified_time":"2026-06-27T03:50:03+00:00","og_image":[{"width":75,"height":75,"url":"https:\/\/www.fsa-law.com\/wp-content\/uploads\/2026\/06\/energia.png","type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"admin","Tiempo de lectura":"3 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.fsa-law.com\/?p=44#article","isPartOf":{"@id":"https:\/\/www.fsa-law.com\/?p=44"},"author":{"name":"admin","@id":"https:\/\/www.fsa-law.com\/#\/schema\/person\/cf17cf84cb7994774463eef9b6d69e70"},"headline":"Power Utilities","datePublished":"2026-06-27T02:29:16+00:00","dateModified":"2026-06-27T03:50:03+00:00","mainEntityOfPage":{"@id":"https:\/\/www.fsa-law.com\/?p=44"},"wordCount":545,"commentCount":0,"publisher":{"@id":"https:\/\/www.fsa-law.com\/#organization"},"image":{"@id":"https:\/\/www.fsa-law.com\/?p=44#primaryimage"},"thumbnailUrl":"https:\/\/www.fsa-law.com\/wp-content\/uploads\/2026\/06\/energia.png","articleSection":["category1"],"inLanguage":"es","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.fsa-law.com\/?p=44#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.fsa-law.com\/?p=44","url":"https:\/\/www.fsa-law.com\/?p=44","name":"Power Utilities - Figueroa Sierra &amp; Asociados","isPartOf":{"@id":"https:\/\/www.fsa-law.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.fsa-law.com\/?p=44#primaryimage"},"image":{"@id":"https:\/\/www.fsa-law.com\/?p=44#primaryimage"},"thumbnailUrl":"https:\/\/www.fsa-law.com\/wp-content\/uploads\/2026\/06\/energia.png","datePublished":"2026-06-27T02:29:16+00:00","dateModified":"2026-06-27T03:50:03+00:00","breadcrumb":{"@id":"https:\/\/www.fsa-law.com\/?p=44#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.fsa-law.com\/?p=44"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.fsa-law.com\/?p=44#primaryimage","url":"https:\/\/www.fsa-law.com\/wp-content\/uploads\/2026\/06\/energia.png","contentUrl":"https:\/\/www.fsa-law.com\/wp-content\/uploads\/2026\/06\/energia.png","width":75,"height":75},{"@type":"BreadcrumbList","@id":"https:\/\/www.fsa-law.com\/?p=44#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.fsa-law.com\/?page_id=21"},{"@type":"ListItem","position":2,"name":"Power Utilities"}]},{"@type":"WebSite","@id":"https:\/\/www.fsa-law.com\/#website","url":"https:\/\/www.fsa-law.com\/","name":"Figueroa Sierra &amp; Asociados","description":"","publisher":{"@id":"https:\/\/www.fsa-law.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.fsa-law.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.fsa-law.com\/#organization","name":"Figueroa Sierra &amp; Asociados","url":"https:\/\/www.fsa-law.com\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.fsa-law.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.fsa-law.com\/wp-content\/uploads\/2026\/06\/cropped-logo-fsa-law-es-blanco.png","contentUrl":"https:\/\/www.fsa-law.com\/wp-content\/uploads\/2026\/06\/cropped-logo-fsa-law-es-blanco.png","width":360,"height":60,"caption":"Figueroa Sierra &amp; Asociados"},"image":{"@id":"https:\/\/www.fsa-law.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.fsa-law.com\/#\/schema\/person\/cf17cf84cb7994774463eef9b6d69e70","name":"admin","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/ec091cb053cefce3948a2248410c46135031d7aa746808e318d240a9dc42ad40?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ec091cb053cefce3948a2248410c46135031d7aa746808e318d240a9dc42ad40?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ec091cb053cefce3948a2248410c46135031d7aa746808e318d240a9dc42ad40?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/www.fsa-law.com"],"url":"https:\/\/www.fsa-law.com\/?author=1"}]}},"jetpack_featured_media_url":"https:\/\/www.fsa-law.com\/wp-content\/uploads\/2026\/06\/energia.png","_links":{"self":[{"href":"https:\/\/www.fsa-law.com\/index.php?rest_route=\/wp\/v2\/posts\/44","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fsa-law.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fsa-law.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fsa-law.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fsa-law.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=44"}],"version-history":[{"count":4,"href":"https:\/\/www.fsa-law.com\/index.php?rest_route=\/wp\/v2\/posts\/44\/revisions"}],"predecessor-version":[{"id":90,"href":"https:\/\/www.fsa-law.com\/index.php?rest_route=\/wp\/v2\/posts\/44\/revisions\/90"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fsa-law.com\/index.php?rest_route=\/wp\/v2\/media\/87"}],"wp:attachment":[{"href":"https:\/\/www.fsa-law.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=44"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fsa-law.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=44"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fsa-law.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=44"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}